Our Project Portfolio

At Jenissi Global Ventures, we offer a comprehensive range of services tailored to meet the complex needs of the oil & gas, marine, and industrial sectors.

40+

Projects

10+

Key Clients

10+

Years Experience

100%

Projects Completion

CLIENT: SEPLAT ENERGY
PROJECT TITLE: AMUKPE FACILITY INSTRUMENTATION & AUTOMATION UPGRADE
PROJECT STATUS: COMPLETED

Installation of 2nos Limit switches on 2nos shutdown valves at the inlet manifold

Installation & Termination of field junction boxes

Earthing of field junction boxes at the Gas blanking 1 manifold

Earthing of field junction boxes at the Gas blanking 2 manifold

Earthing of field junction boxes at inlet manifold

Hook up of 1 no shut down valve at inlet manifold 26-UZV-101

Installation and alignment of magnetic array on control valves 26-PY-102,26-PY-103,44-PY-101A,44-PY-101B

Carryout cable harnessing, glanding and termination on the ICSS panel and Junction boxes, and field instruments

Carryout installation of all field instruments such as pressure transmitters, DVC positioners on the control valves, solenoid valves and limit switches on the shutdown valves, audible alarms

Procure and install a fully functional Allen Bradley ICSS based panel with a mini panel HMI to cater for the following IOs: a. Analog Input – 23Nos b. Discrete Input – 24Nos c. Discrete Output – 16Nos d. Analog Output – 16Nos

Carryout 3 stages of calibration of the guided wave level transmitters, audible alarms, and the shutdown valves.

Calibration of all the level colour displays on the operator graphics for all eight (8nos) vessels, such that the level signal displayed in the field device correspond to the level colour display on the graphics, at least to one decimal point accuracy

CLIENT: SEPLAT ENERGY
PROJECT TITLE: TRANSFER OF AMUKPE FACILITY FLKO LEVEL SIGNAL TO THE ICSS
PROJECT STATUS: COMPLETED

Modifications and optimization of Pressure indicating signals from the Air Receiver unit to the LTF control system successfully commissioned and handed over.

Modifications of Surge Vessels Pressure indicating signals from the Surge Vessels to the LTF control system and Pressure Safety signals that provides safety shut downs between the Surge Vessels and the Export pumps. All signals monitored and control from the LTF control systems

Installation of level switch at the FLKO Vessels

Installation of level controller at FLKO vessels

Tubing hook up to level switch pneumatic Y output to Robertshaw panel

Modifications and optimization of FLKO vessels level alarm signals to the ROBERTSHAW PANEL for pneumatic control and the LTF control system successfully commissioned.

Carryout logic and HMI system configuration and integration

Reconfiguration of all the level signals to be displayed in percentages

Provision of an Allen Bradley expert for the system logic configuration and integration.

CLIENT: SEPLAT ENERGY
PROJECT TITLE: Installation of Runtime License and Control Logic upload for Amukpe Buffer Tank
PROJECT STATUS: ONGOING

Rockwell Automation-Factory Talk View Machine Edition (ME) Runtime License

System and Logic Configuration/Program & Provision of Himatrix Expert Ethernet Cables & Accessories

CLIENT: SEPLAT ENERGY
PROJECT TITLE: INSTRUMENTATION & AUTOMATION UPGRADE BUFFER TANK
PROJECT STATUS: COMPLETED

Design, Build, Functional Allen Bradley ICSS Panel

Configuration and programming of ICSS Panel

Communication setup between PCS,SIS & HMI

Function Testing of All field devices to the control system

Loop function testing between the field devices to the ICSS

CLIENT: AMNI INT’L PETROLUEM DEVELOPMENT COMPANY LTD
PROJECT TITLE: Inspection and Corrective work on the flow stream meter N1 and Flow control valve (MOV) on stream 1,2 & 3 for Princess Awani
PROJECT STATUS: COMPLETED

Servicing/Maintenance/calibration of 10” Turbine Meter

Installation of 10” Turbine meter

Inspection and correction work on MOVs on stream 1,2,&3

Proving of stream 2&3

CLIENT: IGPES GAS AND POWER
PROJECT TITLE: GENERAL WORKS
PROJECT STATUS: COMPLETED

Supply and Installation of Solar Panels

Fabrication Tools & Equipment

Welding consumables & Tools for Abura shop Fabrication

Consumables (Drilling Bits & Cutting Nozzles)

Maintenance of Gen Set & Back-Hoe

Overhauling of 135KVA Perkings Generator

Maintenance of Gen Set

Maintenance of self-Loader Truck [BGB 313 AA]

UB For ABURA warehouse Fabrication

Shelter structural steel corrosion control

Equipment Maintenance in TAFL

Grove Crane Repairs

Internal Lighting for TAFL Workshop

CLIENT: UNITERM NIGERIA LIMITED (UNL)
PROJECT TITLE: GENERAL WORKS
PROJECT STATUS: COMPLETED

CTU Hand Tools and Accessories Base Maintenance

CLIENT: AOS Orwell
PROJECT TITLE: GENERAL WORKS
PROJECT STATUS: COMPLETED

Crane Hire for offloading of 500kva generator

CLIENT: PILLAR OIL LIMITED
PROJECT TITLE: GENERAL WORKS
PROJECT STATUS: COMPLETED

Procurement, Installation & Calibration of Yokogawa Temperature Transmitter at UPF